Natalie Yanni

Project title

In this project, we are required to design an animal bridge for animals to cross over the motorway as the roads/agriculture/housing cause habitat fragmentation and negatively influence the biodiversity of the animal species. As well as an animal bridge, we design a wildlife care facility and a breeding facility for a chosen endangered animal in order to increase their number. Also, we design a factory for a chosen fruit to produce and sell to the public. 

In this project, we are required to design an animal bridge for animals to cross over the motorway as the roads/agriculture/housing cause habitat fragmentation and negatively influence the biodiversity of the animal species. As well as an animal bridge, we design a wildlife care facility and a breeding facility for a chosen endangered animal in order to increase their number. Also, we design a factory for a chosen fruit to produce and sell to the public. 

Project title

This project is split into 2 phases. The first phase requires us to design a circus, based on a chosen existing circus, located on a boat. The specific elements of the circus are linked to the essence and background of the chosen circus. As well as this, we have to design a seating tensegrity structure on the pavement for the public to watch the performance. In phase 2, we design a pre-fabricated, semi-permanent linear building which is place instead of the tensegrity structures which consist of the administrative office, gym and physio-spa for performers, wire training, and occasional performance space. 

This project is split into 2 phases. The first phase requires us to design a circus, based on a chosen existing circus, located on a boat. The specific elements of the circus are linked to the essence and background of the chosen circus. As well as this, we have to design a seating tensegrity structure on the pavement for the public to watch the performance. In phase 2, we design a pre-fabricated, semi-permanent linear building which is place instead of the tensegrity structures which consist of the administrative office, gym, and physio-spa for performers, wire training, and occasional performance space.